City of Lewisburg Water System Contract 4

Project involves the construction of a new 600,000 gallon wire wound, pre-stressed concrete pre-sedimentation tank; installation of clarifier equipment in the new tank; sludge valve vault; sludge pump station; improvements to the existing pre-sedimentation basin consisting of demolition of existing equipment, installation of new flocculation, plate settlers and sludge collection system equipment, concrete rehabilitation, and installation of handrail and access stairs; plant piping; site work; fencing; electrical work.

Owner:  City of Lewisburg

Architect/Engineer:  Chapman Technical Group

Location:  Lewisburg, WV

This slideshow requires JavaScript.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s